Visual and Instrumental Investigations and Preparation of the Corresponding Report
The project was implemented in 2018.
The subject of the order was a visual and instrumental study and preparation of a corresponding report on the condition of the building along the axes "H-P" and "88-112" (45 * 138 = 6210 m2) of the building of the former “Dgani” 900 in Rustavi.